MBRC engaged Ryan Civil Contracting to carry out the rehabilitation of Youngs Crossing Road, between Dayboro Road and the floodway (approx. 500m). Due to the high traffic volumes, significant traffic management and construction planning was required to ensure the works were delivered at a high quality with minimal disturbance to stakeholders and road users.
Project Summary
- Traffic management for day/night works with multiple configurations
- 700m3 cut and remove off site
- 300m3 of 200mm TMR cemented gravel working platform including ‘pre-cracking’ process
- 5000m2 of asphalt pavements
- 27m2 of concrete pathways
- Demolition and construction of stormwater drainage
- Line marking and stencils
LOCATION: Youngs Crossing Road, Petrie
CLIENT: Moreton Bay Regional Council
DATE: August 2019